Newswire

Tag: fuel loading

NRC okays fuel loading at new Vogtle unit

August 4, 2022, 9:30AMNuclear News
Unit 3 at the Vogtle site in July 2022. (Photo: Georgia Power)

The Nuclear Regulatory Commission has authorized Vogtle plant operator Southern Nuclear to load fuel and begin operation at Unit 3—the first reactor to reach this point in the agency’s combined license process. (Prior to 1989, reactors were licensed under a two-step process, requiring both a construction permit and an operating license.)

China’s second Hualong One reactor starts commercial operation

March 29, 2022, 12:00PMNuclear News
The Fuqing nuclear power plant. (Image: CNNC)

The Fuqing nuclear plant’s Unit 6, one of two Chinese-designed and -developed Hualong One reactors at the site, has entered commercial operation, China National Nuclear Corporation (CNNC) announced on March 25. The milestone was reached some 14 months after the reactor’s twin, Fuqing-5, became the first Hualong One in the world to enter commercial operation.

Also known as the HPR1000, the Hualong One is a 1,000-MWe Generation III pressurized water reactor that incorporates design elements of CNNC’s ACP1000 and China General Nuclear Power Group’s ACPR1000+.

Hot functional testing at Pakistan’s Karachi-3 completed

November 15, 2021, 9:30AMNuclear News
The Karachi nuclear plant in southern Pakistan. (Photo: CNNC)

Hot functional testing at Unit 3 of Pakistan’s Karachi nuclear power plant has been completed ahead of schedule, and the reactor has entered the fuel loading stage, China National Nuclear Corporation announced on November 11.

First Hualong One reactor connected to grid

December 2, 2020, 6:59AMNuclear News

China’s Fuqing nuclear plant. Photo: CNNC

Unit 5 at China National Nuclear Corporation’s (CNNC) Fuqing nuclear plant in southeastern China’s Fujian Province has become the world’s first Hualong One reactor to be connected to the power grid, the company announced on November 27. “It was confirmed on-site that all technical indicators of the unit met the design requirements and that the unit was in good condition,” CNNC said.

Fuel loading at Fuqing-5 began on September 4, following the issuance of the reactor’s operating license by China’s Ministry of Ecology and Environment. The loading of 177 sets of fuel assemblies was completed on September 10, and initial criticality was achieved on October 21. The unit is scheduled to enter commercial operation before the end of the year.

Also known as the HPR1000, the Hualong One is a Chinese-designed and -developed 1,000-MWe Generation III pressurized water reactor, incorporating design elements of CNNC’s ACP1000 and China General Nuclear’s ACPR1000+ reactors. Fuqing-5’s twin HPR1000, Fuqing-6, is scheduled to start contributing power to the grid next year.

New unit delivers first electricity to Russian grid

October 30, 2020, 7:02AMNuclear News

Rosenergoatom, the electric power division of Russia’s state-owned nuclear power corporation Rosatom, announced on October 23 that Leningrad II-2 has been connected to the grid. The unit is one of two Generation III+ VVER-1200 pressurized water reactors at the Leningrad nuclear plant.

The reactor will replace Leningrad I-2, a 925-MWe RBMK-1000 light-water–cooled graphite-moderated reactor that will permanently cease operation at the end of 2020 after 45 years of service. Fuel loading at Leningrad II-2 began in July, and initial criticality was achieved in August. Following the trial operation, the unit will be shut down for an additional equipment inspection by a state commission before being put into commercial operation early next year, according to Rosenergoatom.